Samples of Student Work
A+A-Print

A wooden planter box built by Year 12 Construction students

Current Projects

Year 11 Construction students are currently working with students from the IEC and 7S to redesign and develop a section of the school grounds. The construction students are currently involved in designing and building a bridge which will pass over a water feature. Students are learning skills in using leveling equipment and a range of construction techniques. Below are pictures of the students hard at work.

Signup to our newsletter:
Name:
Email:
 
Board of Studies NSW NSW HSC online
NSW Department of Education and Training
   
 
   
copyright 2005 - 2006 Warrawong High School
powered by webation active